CORAL INNOVATION HUB | US VIRGIN ISLANDS
-
Pre-construction site of The Nature Conservancy’s Coral Innovation Hub (CIH) at Estate Little Princesse, St. Croix, US Virgin Islands.
-
Site cleared and graded for construction.
-
River helps clear debris for site preparation.
-
Footers poured for container and concrete slab for workshop.
-
Portable drilling rig setup to drill seawater supply well.
-
Trenching for electrical and plumbing runs from seawater well to the facility.
-
Electrical conduit and plumbing installed from seawater well to the facility.
-
Pulling wiring from the seawater pump to the facility’s main panel and backup generator.
-
Final connections to seawater well pump.
-
20’ high cube shipping container to house recirculation reservoirs, filtration equipment, and controls.
-
Crane setup to offload wet lab, dry lab, and office containers fabricated in Florida and shipped to St. Croix.
-
Offloading and placement of prefabricated containers to footings.
-
Offloading filtration container to footings.
-
Staging plumbing and equipment for facility construction inside the empty wet lab container.
-
Installing service lighting, mini-split AC, and recirculation reservoirs inside filtration container.
-
Installing RO/DI evaporation top-off system.
-
Fabricating mounting panels for Ozonizers and APEX controllers. panels.
-
Ozonizer and APEX control panels mounted inside filtration container.
-
Routing recirculation and filtration equipment plumging runs through container wall.
-
Plumbing primary pumps, reservoir drains, actuated valves, chiller recirculation loop and foam fractionators.
-
Plumbing stem outs for all internal filtration components.
-
Finalizing all electrical supply, Ozonizers, and APEX controller connections.
-
Installing titanium split unit chiller heat exchangers.
-
Installing electrical supply, disconnects, and concrete pads for chiller condensing units.
-
Poured concrete pedestals for raceway supports.
-
Raceways positioned on pedestals, drilled for bulkheads, fabrication/installation of supply manifolds, and primary drain and supply runs routed to filtration container.
-
Final connection of raceway reciruclation drains and seawater supply runs to filtration container.
-
River takes charge of backfilling excavated utility trenches.
-
Plumbing, electrical, and filtration completed and ready for shadecloth installation.
-
Installing overhead shadecloth system.
-
Overhead shadecloth system installed.
-
Facility is ready for final commissioning.
-
Initial seawater fill.
-
Raceways filled and recirculating with filtration container.
-
Filtration container fully operational.
-
Retractable rain cover systems designed and installed.
-
Wet lab container prepared for build out.
-
Build out of wet lab container begins.
-
Outdoor nursery fully operational.
Commissioned 2021
-